Track renewal of the Balaguer-La Pobla de Segur line. Ferrocarrils de la Generalitat de Catalunya.
|
 |
Renovation of the track between Llanes and Vidiago. FEVE
|
 |
Renovation of the track between San Pedro de Rudagüera, and Casar de Periedo. FEVE |
 |
PORTUGAL-Fergrupo. Re-conditioning of the track superstructure between Âncora and Lanhelas. REFER.
|
 |
ITALY-Valditerra. Complete track renewal for the provinces of Genoa and Trieste. RFI.
|
 |
Track renewal and ballast-clearing project in Palazzolo Milanese Ferrovia Nord Milano.
|
 |
POLAND-Trakcja Polska-PKRE-PRKil.
Track renewal, electrification and substation renewal work on the E30 line. The Okmiany-Boleslawiec and Boleslawiec-Zebrzydowa sections. PKP-PLK.
|
 |
Renewal work on the E20 line (Minsk Mazowiecki-Siedlce section). PKP PLK |
 |
ARGENTINA - COMSA de Argentina. Alteo del Pedraplén (project to raise underwater track) of the San Martín Railway at La Picasa lagoon. Ministry of Federal Planning. National Transport Secretariat. |
 |
AUSTRALIA - MVM Rail.Construction of the rail sections for the iron mines of the Mount Newman-Port-Hedland line in Western Australia. BHP Billiton.
|
 |
Renewal and improvement of the line between Melbourne and Sydney. Australian Railway Track Corporation (ARTC).
|
 |
Modernisation of Northern Line (Alverca Station Access). (PORTUGAL) |
 |
Remodelling Passada, Pedra Caldeira and Valeira Railway Tunnel.
(PORTUGAL) |
 |
Conservation Roboura, Santiinho and Régua Railway Tunnel.
(PORTUGAL) |
 |
Northern Zone Project. (CHILE) |
 |
Operation and maintenance of 22 level crossings. Chimbarongo-Chillán
Sector. (CHILE) |
 |
Work on the Fremantle Port in Perth West. (AUSTRALIA) |
 |
Track Renewal on the Central Line. Track rehabilitation on the
Chillán-Temuco and Temuco-Mariquina sectors (Chile)
|
 |
Renewal of the Perth to Mandurah Line (Australia) |
 |
Renewal of the Melbourne Tramway network (Australia) |
 |
Track duplication of the San Giovanni in Persiceto-Crevalcore
section. Bologna-Verona Line (Italy) |
 |
Renewal of the Duero Line: ballast clearing y ballasting (Portugal)
|
 |
Repositioning and adjustment of the Linha de Sines track (Portugal)
|
 |
Renewal of the Linha do Sul: lengthening of the Vale das Iscas
Tunnel on the Funcheira-Santa Clara section (Portugal) |
 |
Renewal of the Linha do Norte |
 |
Preservation of the Linha do Minho |
 |
Track renewal and modernisation of the catenary.
Section: Granollers-Massanet |
 |
Renewal. Atlantic Axis. Line: Osebe-Santiago
|
 |
Track renewal, Tarragona-Barcelona-France line, Granollers-Massanet
section
|
 |
Modernisation of the infrastructure and track. Linha do Sul.
Section Funcheira-Santa Clara (Portugal)
|
 |
Modernisation of the infrastructure and track. Linha do Sul.
Tunes-Faro Section (Portugal)
|
 |
Rectification of curves and improvement of the layout. Medina
del Campo-Fuentes de Oñoro line. Section: Medina del Campo-Salamanca
|
 |
Renewal of the track. Monforte-Ourense-Vigo line. Section: Arbo-Guillarei
|
 |
Track renewal and replacement of apparatus. Mérida-Los
Rosales line. Section: Almendralejo-Zafra
|
 |
Track renewal. Linha do Norte. Section: Albergaria-Alfarelos
|
 |
Doubling Linha do Minho. Section: Sao Romao-Lousado
|
 |
Track and catenary renewal on the Linha do Norte. Sub Section
2.1.: Entronçamento-Albergaria dos Doze (Portugal)
|
 |
Track renewal. Palencia-A Coruña line. Section: Curtis-Betanzos
|
 |
Remodelling of the Northern station mouth. Alcázar de
San Juan Station
|
 |
Improvements. Betanzos-Ferrol line
|
 |
Track renewal. Genoa-Turin line. Mignanego-Ronco section (Italy)
|
 |
Track renewal. Ventimiglia-French Border international section
(Italy)
|